As we all know, the construction of air-film buildings is not affected by seasons, and can be built all year round. Summer is a good time for building construction, but in summer, the increase of rain increases the difficulty of construction. In order not to affect the smooth progress of the project, but to increase the construction cost in rainy season, it is necessary to prepare the construction measures for the construction of the gs air dome in rainy season. What are the specific precautions? Let's take a look.
1. Before the rainy season, the relevant departments of the construction unit shall carry out a comprehensive inspection within their scope, check the drainage condition of the construction site and the leakage prevention of temporary facilities, repair and strengthen the original drainage system, and add drainage facilities to ensure smooth water flow if necessary. Put prevention first, follow the general principle of "do a good job in drainage, water retaining and waterproofing", and ensure normal construction and production in rainy season, free from the influence of seasonal climate.
2. During hoisting, if there is water on the membrane material of the air dome building, it shall be cleaned before installation, but the membrane surface shall not be damaged.
3. Waterproof and thermal insulation materials shall be stored in a dry place and shall not be exposed to moisture and rain. Materials placed in the open air shall not be immersed in water to prevent loss and waste.
4. Implement various safety measures for temporary electricity use in strict accordance with the Technical Code for Safety of Temporary Electricity Use on Construction Site. All electrical equipment used in the open air should be placed in a high dry place. The main distribution box, sub-distribution box and switch box should have reliable rain-proof measures. The electric welding machine should be equipped with a protective rain cover. In the rainy season, check whether the zero connection and grounding protection measures of the on-site electrical equipment are reliable, and whether the leakage protection device is sensitive, Check whether the wire insulation joint is in good condition.
5. After the rain, the erection of the scaffold safety net and the ground anchor shall be carefully inspected in time, and the problems found shall be handled in time.
In short, during construction in rainy season, the management of construction site should be strengthened, and regular professional training and construction safety education should be carried out for construction personnel to improve their safety awareness. Only by putting safety first can we ensure "zero accident" of the project. At the same time, we should ensure that the construction of indoor works will not be affected in the rainy season, the construction of outdoor works will not be interrupted in the light rain, the construction will be suspended during the heavy rain, after the heavy rain, the construction will continue without problems after the test of the engineering department's surveyors, and after the heavy rain, the construction will not be affected.