Air dome indoor ski resort

Air dome specification: 150m long x 66m wide 7000m2


Project completion time: September 2020


Basic information of the project: The project is a part of the ice and snow sports center of a city. The first floor shop, the second floor wall installation, three layers of membrane materials, and high-tech thermal insulation materials are installed in order to meet the requirements of minus 10 degrees in the museum. The whole construction period of the project is 45 days.