Air dome specification: 35m long x 35m wide 1225m2
Project completion time: June 2019
Basic information of the project: The project is designed as a badminton hall, with prefabricated ring beams fixed, and adopts a warm and natural lighting scheme to achieve the purpose of energy conservation and emission reduction. The whole construction period of the project is 20 days.