Air film specification: Hall 1: 43.5m long x 34m wide 1479m2;
Project completion time: May 2019
Hall 2: 62m long x 34m wide 2108m2
Canopy specification: length 30mx width 18.2m 546m2
Basic information of the project: The project is designed as a comprehensive sports stadium, equipped with air film and tarpaulin, and the air film is the roof sports stadium. Through the special design of lightweight fixed beam, the construction of air film fixed beam is completed without damaging the safety of the original building. The whole construction period of the project is 60 days.