Specification of gas film: length 32m x width 30m 960m2
Project completion time: March 2019
Basic information of the project: The project is designed as a school sports hall, and the patented non-ring beam anchoring scheme is adopted to ensure that the existing rubber sports ground is not damaged. It is set as a comprehensive sports hall, and the whole construction period of the project is 10 days.