Air film specification: 45.8m long x 26m wide 1190.8m2
Project completion time: November 2019
Basic information of the project: the main body of the project is Changchun Longjiaguo Airport, the prefabricated ring beam is fixed, the design is a basketball and badminton stadium, and the thermal insulation and natural lighting design scheme is adopted to achieve the energy conservation goal. The whole construction period of the project is 25 days.