Air film specification: length 64m x width 60m, area 3840m2
Project completion time: May 2020
Canopy specification: length 52.3m x width 28.3m, area 1480m2
Basic information of the project: The project is designed as a national sports park, equipped with air film and tarpaulin. The air film pavilion is designed as a swimming pool, and the tarpaulin is designed as a basketball and badminton stadium. The whole construction period of the project is 50 days.